Customization: | Available |
---|---|
Certification: | CE, ISO9001 |
Condition: | New |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
5 Ton to 300 ton Molten steel casting foundry metallurgy bridge overhead ladle crane has been widely used in metallurgical industry, which is of great importance to deal with the complex environment of metallurgical industry, reduce labor intensity and improve production efficiency.The main production workshops of metallurgical factories are equipped with all kinds of special bridge cranes specially designed for metallurgical process operation, which are usually installed and tested before the main process equipment is put in place.
Metallurgy bridge crane is one of the main production equipment, smelting workshop in converter workshop with the crane will be shipped from blast furnace workshop of molten iron into the mixer to the mixer and the molten iron or shipped from blast furnace workshop of molten iron directly into the converter, the crane is equipped with independent drive, vice car, the car setting fixed spacing of longmen hook, lifting ladle. The auxiliary trolley can be used to tilt the steel bucket or do other auxiliary lifting operations. The crane adopts closed slant rail box girder, so it has good vertical and horizontal rigidity.
Lifting Capacity |
T |
5 |
10 |
16/3.2 |
20/5 |
32/5 |
50/10 |
74/20 |
|
Span |
m |
10.5-31.5 |
|||||||
Speed |
Main Hook Lifting |
m/min |
15.5 |
10.4 |
10.7 |
9.8 |
7.8 |
7.8 |
6.1 |
Aux. Hook Lifting |
14.6 |
15.5 |
15.5 |
10.4 |
9.7 |
||||
Traveling of Trolley |
37.2 |
43.8 |
44.6 |
44.6 |
42.4 |
39.3 |
33.8 |
||
Crane travelling |
92.7/93.7 |
92.7/93.7 /86.5 |
76/89 |
76/89 |
89/75.3 |
75/76.6 |
67.3 |
||
Operational Model |
Cabin |
||||||||
Working Duty |
A7 |
||||||||
Power Supply |
Three-phase A.C. 380V, 50Hz or customized |
1. Q: What's your MOQ?
A: 1 Set;
2. Q: What's your package?
A: Main body in plywood box or in plastic woven cloths; Spare parts in plywood boxes;
3. Q: What's your delivery period?
A: Within 10/25/40 days after your prepayment received; exact period should be based on detailed requirements and actual period;
4. Q: What's your warranty period?
A: 12 months from winches accepted;
5. Q: Do you have engineer oversea installation service?
A: Yes; We have;
6. Q: What kinds of products do you have?
A: All kinds of industrial electric winch (especially non-standard); Overhead Crane; Gantry Crane, Electric Hoist; Screw Hoist; Radial/Flat Gate Hoist; Steel Gate; etc.
7. Q: Could we buy spare parts in local once they are out of work?
A: Our main electrical parts brand is Siemens or Schneider brand; it's very easy to buy all the world. But if there is any difficulty, we can post to you by express, such as DHL, UPS, FEDEX, Aramex, etc.
8. Q: Do you provide lift tools?
A: Yes, we can provide any kinds of lift tools such as lift sling belt, lift clamp, grab, magnet , pulley blocks, hook, lock catch, wire rope, fiber rope, etc.
9. Q: Could your winches drag inclined?
A: Yea, our electric winches could drag horizontal, drag inclined, hoisting vertical.