Chinese top supplier bridge building machinery for highway is bridge crane that places precast concrete beam into precast pier. And it consist of main girder,front leg, middle leg, rear leg, rear auxiliary leg, lifting trolley, hydraulic system and electrical device.
Detail Pictures:
Main technical parameter:
Span |
50m | 40m | 30m | ||||
Type | QJ200/50 | QJ180/50 | QJ160/50 | QJ140/40 | QJ120/40 | QJ100/30 | QJ80/30 |
Rated capacity | 200t | 180t | 160t | 140t | 120t | 100t | 80t |
Bridge span | 30~50m | 20~40m | 20~30m | ||||
Max.slope | longitudinal slope ≤5% Cross slope ≤5% | ||||||
Lifting speed | 0.41m/min | 0.45m/min | 0.5m/min | 0.56m/min | 0.65m/min | 0.75m/min | 0.9m/min |
Trolley longitudinal speed | 3m/min | ||||||
Trolley cross speed | 3m/min | ||||||
Crane slide longitudinal travel speed | 3m/min | ||||||
Crane slide cross travel speed | 3m/min | ||||||
Adaptive inclined bridge angle | 0~45° | ||||||
Adaptive curved bridge radius | 400m | 300m | 200m |
Crane hole principle diagram:
Process description:
1,Installate the launcher,check the functioning of the institutions, subject to normal after the main girder leveling, and place the girder to end of launcher;
2,Lift the front legs and rear leg , so that the main beam elevated and middle leg lift off ground, and then move the middle leg front. And move the two trolley rear;
3,Loose front leg and rear leg, let middle leg and rear leg support the main girder and leveling main girder again and then move it to fron about 35m;
4,Front trolley lift bridge girder at the end and make flat bed support the other end, which can make the main girder front movement steady;
5,Move the main girder as well as the flat bed front 10m, then make front leg touch new pier and suppout the main girder again. And then finish the work of launch the girder.Erection schematic diagram of side beam
Erection principle diagram of Side beam:
Process instructions
1,Place first girder to second gider position;
2,Move launcher, make center line of outer main girder conicide with that of first girder;
3,Move the trolley to most left side, and then lift the girder off ground.
4,The whole launcher move to position of first girder, then lay down the girder.
Application:
Bridge building machinery for highway is suitable for highway and railway bridge, such as straight bridge, skew bridge, curved bridge and so on.